Members will receive 25% discount.

Repairs and construction underway

There are projects in being done.

  • George Rose has all most single handled constructed the gas line into the double wide units and the little red building.  Hopefully we can get the gas in the beige  unit to allow us to move pantry nto it.  George and Sandra have also donated a 40000 but blue flame un vented heater and a 10000 btu heater.  The large heater will be used in the beige unit.

I have started repairs to the women's downstairs restroom.  The floor has to be replaced under the commode and the area re-tiled.  This is as far as I have gotten on it.